Control in your hands.
BuildZig Funds Control puts the control back in your hands. Using our per draw fee calculator, you can get a quick and easy estimate on your per draw fee
Note:
Please make sure to complete only the fields that pertain to the type of project. If you have any questons, we are here to help:
1 800 380 0876
1 800 380 0876
Guide to Answering Questions
Number of Units
If multi-unit project, enter the number of units below. If not leave blank.
Inspection Type for Multi-Unit
Choose "Overall Progress" if only the status of overall progress is required with the inspection report showing samples of work from selected units, not each unit. Enter "Progress at Each Unit" if status of progress of each unit is required to be shown in photos and the report.
Budget Format for Multi-Unit
Enter "Integral Budget" if the line items are not separated by unit. Enter "Per Unit Budget" if the line items are separated by unit.
Budget Amount
Enter the amount of the project budget.
Location
Enter the location of the project from the drop-down menu.
Scope of Construction
Enter the scope of construction from the drop-down menu.