Funds Control Projects

Downtown Condos

Originally built in 1924, this former garment-manufacturing building in San Francisco's SOMA district was converted from industrial use to mixed-use. The project provided much-needed new housing in the Mid-Market area. It also generated business and employment opportunities for local residents and the tech community. 

BuildZig provided funds control services for this project.

Flex Office Space

This four-story commercial building features nearly 60,000 square feet of creative office space in an amazing location. The owner fully redeveloped the building, putting in a brand new lobby, new elevators, and best-in-class amenities. The roof features a substantial deck with lighting, tables, and seating with wide open views of the Bay.

BuildZig provided funds control services on this project.

2-Story Ranch Style

This contemporary ranch was remodeled from the inside out. This home was given a complete makeover, from the daily luxuries of seamless shower doors and central forced heating & A/C, to new irrigation systems, pavers, and stamped concrete. 

BuildZig provided funds control services on this project.

New online
Fund Control System

makes the draw process easy and fast

3007 Telegraph Ave. Oakland, CA 94609

© 2018, Buildzig™ All Rights Reserved. Site by MD&D